Day 1. We’ve arrived!
First work day on the 2 sites. A little roofing, a little ditch digging, a lot of teamwork.























Day 2 at the sites. A lot of hard work and relaxing yoga at the end of the day!

















Day 3: Another day of hard work. Finished the deck, floored the bedroom with molding, dug a trench around half the house and even had time to visit Climax Springs and Painted Rock!!
Painted Rock What a view!!
Last day on Work site 1 – shingled a roof and installed a front door and windows in 95 degree heat (105 on the roof). the only casualty was a boot that was lost to the tar on the roof. And at the end of the day a barbecue with a very grateful family!
Final picture of our hard earned 2019 CAP Mission Team blue shirts!
(That’s Maria our CAP rep in the front of this selfie)